McAnally Center sports new gym floor

Thursday, July 30, 2015
The new gym floor in McAnally Center at Greencastle High School was finished this month and features a darker floor with a lighter stained wood on the interior of the three-point line. Greencastle Principal Rus Hesler asked David Basan, an industrial tech teacher at the high school, and Basan's class to present him with viable options for a new gym floor. The class presented Hesler with at least six options, which Hesler critiqued. Hesler has worked at Greencastle for more than 35 years and has a knowledgeable background in graphic design. Hesler then commissioned Cincinnati Floor Co. to handle the project at McAnally. Hesler also wanted permanent practice markings such as the dots and ladders for the basketball teams imbedded into the floor, in order to save the Tiger Cub teams set-up time. (Banner Graphic/JAY LOCKETT)

Principal Rus Hesler was handed many different designs by David Bason's industrial tech class. Helser wanted a floor that sparked GHS pride and would withstand the test of time. (Banner Graphic/JAY LCOKETT)
A long look at the new gym floor in McAnally. (Banner Graphic/JAY LOCKETT)
Comments
View 1 comment
Note: The nature of the Internet makes it impractical for our staff to review every comment. Please note that those who post comments on this website may do so using a screen name, which may or may not reflect a website user's actual name. Readers should be careful not to assign comments to real people who may have names similar to screen names. Refrain from obscenity in your comments, and to keep discussions civil, don't say anything in a way your grandmother would be ashamed to read.
  • a beautiful new floor for a beautiful facility-well done g'castle!!

    -- Posted by nphs92 on Sat, Aug 1, 2015, at 10:05 AM
Respond to this story

Posting a comment requires free registration: